Shop Drawings Birkenhead

Shop drawings should include information for the architect and engineer in Birkenhead to compare to the specifications and drawings. The shop drawing should address the appearance, performance, and prescriptive descriptions in the specifications and construction drawings.

Local Companies

H Bentley & Co
0151 647 8494
4 Pool Street
Birkenhead
Cornerstone Builders
0151 644 9066
12 Highfield Grove
Birkenhead
Peter Growcoot Ltd
0151 707 1409
14 Colquitt Street
Liverpool
Wayman Building
0151 922 9903
Seymour Street
Bootle
Steve Rice Construction
0151 933 1538
85 Trinity Road
Bootle
Trustland (Construction) Ltd
0151 653 5566
6a Lingdale Rd North
Birkenhead
C & R Stewart
0151 608 0440
13 Mallory Road
Birkenhead
William Mooney & Sons Ltd
0151 709 4727
College Lane
Liverpool
Impact
0151 933 7845
188 Regent Road
Liverpool
Crown Construction
0151 281 8971
88 Kensington
Liverpool

Provided By:

Shop drawing

Author: himfryang

I want to introduce something about MIXED COLOR STEEL SHEETS. MIXED COLOR STEEL SHEETS THICKNESS: 0.3MM to 0.8MM WIDTH: 600 MM to 1230MM LENGTH: 900MM to 2400MM WEIGHT: LESS THAN 5 TONS/ BUNDLE QUALITY: WITHOUT STITCHED & DONUT STEEL SHEETS QUANTITY: 250 TONS/ MONTH PACKING: STEEL BAND BARE ONE HS CODES: 7210.49 7210.30 7210.

(Redirected from Shop drawings)

A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator. Shop drawings are typically required for pre-fabricated components. Examples of these include: elevators, structural steel, trusses, pre-cast, windows, appliances, cabinets, air handling units, and millwork. Also critical are the installation and coordination shop drawings of the MEP trades of Divisions 15 and 16 such as sheet metal ductwork, piping, plumbing, fire protection, and electrical. Shop drawings are not produced by architects and engineers under their contract with the owner. The shop drawing is the manufacturer or the contractor drawn version of information shown in the construction documents. The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect drawing. The shop drawing primary emphasis is on the particular product or installation and excludes notation concerning other products and installations, unless integration with the subject product is necessary.

Information required to be included in Shop Drawings and eggs

Comparison information for the architect and engineer

The shop drawings should include information for the architect and engineer to compare to the specifications and drawings. The shop drawing should address the appearance, performance, and prescriptive descriptions in the specifications and construction drawings. The shop drawing often is more detailed than the information shown in the construction documents to give the architect and engineer the opportunity to review the fabricator version of the product, prior to fabrication. References to the construction documents, drawings, and specifications assist the architect and engineer in their review of the shop drawings. Attachment of manufacturer material specifications, catalog cut sheets, and other manufacturer information may be helpful to accompany these drawings. Because shop drawings facilitate the architect and engineer approval of the product, they should be as clear and complete as possible.

Notes of changes or alterations from the construction documents

Notes concerning changes or differences from the original documents should be made on the shop drawing for the architect and engineer approval. Ultimately, they are responsible for changes in these drawings and should have the opportunity to analyze any modifications. A dialogue should occur between the fabricator and the architect and engineer about any areas needing clarification. Successful installations are the result of collaboration between the designer, fabricator, and contractor.

Information needed to fabricate the product

Dimensions, manufacturing conventions, and special fabrication instructions should be included on the shop drawing. It should be clear to fabrication personnel what will be manufactured from the shop drawings alone. The construction documents are rarely used as a reference in fabrication, with the fabricators relying on the shop drawing for all information.

Indication of dimensions needing verification from the jobsite

Most jobsite dimensions, such as the dimensions between two surfaces on the jobsite, need to be verified. A dimension may be shown on the construction drawings, but the actual dimension may vary, from very small to large increments, depending on jobsite conditions. It is extremely important that the fabricated item arrive on the jobsite ready to be installed without field modification. Special care must be taken by the contractor to measure and verify dimensions. In new construction, plan dimensions usually are sufficient for ordering many fabricated items such as structural steel or precast concrete.

In remodeling and renovation work, it is essential that field dimensions be verified prior to fabrication. Some fabricators, such as cabinet and casework suppliers, prefer not to rely on the contractor verification and will verify the dimensions with their own...(and so on) To get More information , you can visit some products about stainless steel profile, christmas light rope. The

MIXED COLOR STEEL SHEETS products should be show more here!


About the Author:

himfr can provide you most popular hot products from china!

Article Source: http://www.articlesbase.com/corporate-articles/shop-drawing-922150.html

Featured Local Company

Trustland (Construction) Ltd

0151 653 5566
6a Lingdale Rd North
Birkenhead
http://www.trustland.co.uk

Related Local Events
RHS Flower Show Tatton Park
Dates: 21/07/2010 - 25/07/2010
Location: Tatton Park
Knutsford
View Details

RICS Expert Witness Roadshow
Dates: 01/12/2009 - 01/12/2009
Location: Crowne Plaza
Liverpool
View Details

TPE 2009
Dates: 01/11/2009 - 01/11/2009
Location: Rapra Technology Ltd
Shropshire
View Details

Materials Testing - MT 2009
Dates: 15/09/2009 - 17/09/2009
Location: Norbreck Castle Hotel
Blackpool
View Details